What We Build
Program A-02
What We Build · A-02

Garage Conversions.

The fastest, most economical path to permitted living space. We transform your existing garage into a bright, code-compliant home.

Garage Conversion · Santa Monica

Your garage, reborn as living space.

Converting an existing garage skips the foundation and framing of new construction, which makes it the quickest and most affordable route to a legal ADU. The footprint is already there, we bring it up to code and up to life.

Insulation, egress, plumbing, a proper kitchen and bath, natural light — everything a garage lacks and a home needs. The result reads as a purpose-built studio, not a converted parking space.

Schedule & Scope
Size
200–500 sq ft
Studio & one-bedroom layouts
Timeline
4–7 months
Faster — no new foundation or framing
Cost
From ~$120k
Typically the lowest-cost route to an ADU
Best for
Rental · guests · office
Homes with an underused garage
What's included
Existing footprint reused
Insulation & weatherproofing
Egress windows & natural light
Kitchen & bathroom build-out
Electrical & plumbing upgrades
Full permitting & inspections
4–7

Months from first drawing to finished space, the fastest ADU path we build.

A recent conversion
PROJECT 02
Garage Conversion · Santa Monica

Westgate Studio

480 sq ft · 1 / 1 · 4‑month build
Next step

See what your backyard can hold.